107 Miles Platting Road

This project required the replacement of a number of VRV condensers and associated fan coil units in a two storey office block.
Works were undertaken on an “out of hours” basis with the air conditioning removed and replaced overnight on a zone by zone basis with no disruption to daytime air conditioning of the office space.

  • Consultant – Ralph Engineering Concepts
  • Equipment – Mitsubishi Electric VRV systems.

Narangba Aged Care

This project consists of 144 aged care bedrooms, multiple dining rooms, nurse stations, community rooms, commercial kitchen and amenities.

  • Construct only project
  • Multiple VRV systems serving aged care rooms and common areas
  • Mixture of ceiling, split ducted and wall hung split units
  • Commercial and satellite kitchen exhaust systems
  • Amenities exhaust systems
  • Central control system
  • Commissioning to CIBSE standards
  • As built documentation
  • Builder/Developer – Croft Developments P/L

Carmel College

This project is for the New Administration block comprising of a central meeting area, multiple offices and staff rooms.

  • Construct only to Building Services Integration P/L documents
  • VRV systems to central meeting area, offices, staff room etc.
  • Mixture of ceiling cassette, split ducted  and wall hung split units
  • Central amenities area ventilation
  • Commissioning to CIBSE standards
  • As Built documentation
  • Builder – InSite Constructions

Redcliffe RSL

This project involved to removal and replacement of chiller plant, air handling unit, pipework and switchboards and the installation of new air handling system to club extension.

  • Construct only to Ralph Engineering Concepts documents
  • Chilled water system
  • Multiple air handling units
  • Chilled and condenser water pipework reticulation
  • Ductwork and registers
  • Modification to existing BMS (Alerton)
  • Commissioning to NEBB standards
  • Workshop drawings
  • As Built documentation

West Village Complex

This project consisted of air conditioning and mechanical ventilation to multi-story tower blocks including residential apartments, retail tenancies & multilevel carpark.

  • Design & Construct
  • Dx air conditioning to apartments and retail tenancies
  • Multilevel carpark C/W CO control
  • Substation, refuse room, loading dock ventilation
  • Stairwell pressurisation system
  • Commissioning to CIBSE standards
  • Workshop drawings
  • As Built documentation

117 Brisbane St Ipswich Icon Tower

This project is a 9 story office block comprising of 17000m² of office space with multiple retail tenancies at ground level.

  • Design and Construct
  • 5 Green Stars (As Built)
  • NABERS predictive rating of 5.0 stars
  • Chilled water system
  • Central variation volume CHW air handling units
  • Pressure independent VAV zoning
  • Auxiliary condenser water system
  • Stair pressurisation system
  • BMS system (Alerton)
  • Commissioning to CIBSE standards
  • As Built documentation
  • Builder – Hutchinson Builders